In Terwolde, this heavily worn feedlot was coated in the summer of 2023. To reduce coating consumption, the surface was first sanded with a concrete grinding machine on day 1. This removed the tops of the pebbles in the concrete, leaving a smooth surface. The surface was then cleaned with an acid cleaner. On day 2, the primer and coating were applied, and after 12 hours of drying time, another coat was applied.